Conservation Commission — August 6, 2026
The Middleborough Conservation Commission held a regular public meeting on August 6, 2026. Routine business was addressed first, including approving payment of accounting bills—such as $8,731.30 to the Public Archaeology Laboratory for a survey of the Stony Brook Pond Dam, $13.77 to Middleborough Gas & Electric, and $3,500 to Stephen Schmiel for peer review—as well as approving the July 16 meeting minutes. The Commission also signed off on a Beaver Conflict Resolution Form to breach a beaver dam at Pratt Farm that was causing trail flooding, and received updates on property acquisitions, trail management, and an Eagle Scout bridge reconstruction project.
The board heard several regulatory filings, including issuing a Negative Determination of Applicability for a Title V septic replacement at 676 Wareham Street and approving an amended Order of Conditions for 485R Wareham Street. An application for a single-family home at Lot 9 Christina Way was approved with a special condition governing the cutting of a dead pine tree, leaving a high stump for wildlife value. Later, the Commission voted to approve the Notice of Intent for municipal water pumping station upgrades across 42 Miller Street, 58 Miller Street, and 387 Wareham Street, finding that an independent peer review was not required following an onsite inspection. Peer review for the ANRAD for parcels along the Route 44/18/495 rotary was awarded to Lucas Environmental for $4,950, and continuances were approved for 0 Vernon Street and the rotary project.
A significant portion of the meeting was devoted to a Notice of Intent submitted by Jerry Pacillo of NESP, LLC for a proposed surf park at 0 East Grove Street, featuring an artificial wave lagoon, three commercial buildings, 35 cottage-style motel units, and related infrastructure. Project engineers from Bowler Engineering and Goddard Consulting presented the stormwater and wetland impact plans, arguing that no impervious surface would be inside the 100-foot buffer and offering a 1.5-to-1 replication area for an isolated vegetated wetland. Several residents and commissioners raised serious questions regarding groundwater levels, potential well contamination, the drawdown of Fall Brook, water treatment methods, and steep slope grading. The hearing was continued to September 3, 2026, with a tentative site inspection planned.
AI-generated summary. May contain errors. Watch the video to verify.
Spotted a mistake? and we’ll check it against the source.